|
Cardinal
Engineering is providing turn-key engineering design for the
complete reconstruction of two sanitary sewer lift stations
and the associated force mains to complete the
infrastructure for the City of Norman to accept sanitary
sewage from the Town of Hall Park.
This “high profile”, emergency project
will complete one of the last remaining steps for the City
of Norman to proceed with the annexation of the Town of Hall
Park.
Cardinal Engineering is preparing
complete design documents for the diversion of the entire
Hall Park sanitary sewer collection system to the City of
Norman collection system. Particular issues included the
determination of design capacity versus existing flows as
well as the elimination of the existing Hall Park sanitary
sewer lagoon system.
Responsibilities
included:
-
Topographic Design Surveys
-
Easement/Boundary Surveys
-
Design Flow Calculations
-
Construction Documents
-
Engineer’s Cost Estimates
-
Bid Documents/Bid Administration
-
Alternative Evaluation
-
Construction Administration
-
Lagoon Closure Plans & Sequencing
Lift Station Design
|