NW 150th Street Widening and Reconstruction
Oklahoma City, Oklahoma

Project Area: 1.0 Mile
Total Project Cost: $2,800,000
Completion Date: 2007
 

Cardinal provided engineering and surveying design services for the widening and reconstruction of NW 150th, from May Avenue to Pennsylvania Avenue. Design work included relocation of several hundred feet of 16-inch and 12-inch diameter water line, with the entire system remaining in service. The project required the redesign of the May Avenue intersection layout to improve traffic flow, safety and existing lighting. The design included a major box culvert through the intersection as well as a major 4-cell box on 150th Street.

 

 

 

 

 

Cardinal’s responsibilities included:

  • Topographic/Design Survey

  • Water Line Relocations

  • Right-of-Way Documents

  • Intersection Analysis and Design

  • Construction Document Development

  • RCB Culvert Design

  • Bid Documents

  • Storm Water Collection System Design

  • Quantity Takeoffs

  • Geometric Design